Sino Mold has
one of the strongest
mold making teams equipment included : precision molding making machine and
mold design teams. The mold making machining process are so sophisticated .
Mold
Making Mentalities
1st step is plastic parts' model analysis and
mold design because building molds are based on figuring out the specification for plastic parts and the
design of mold could make this plastic part just in the perfect way
Mold Making Technologies
Mold
making technologies are included mold design, it is came from mold making
experience and the understanding to mechanical, the knowledge to steel and
plastic.
Mold
Making Machines
After making
the design, we need precise mold making machines and eequipmentto do all the
components according to their dimension tolerance. To do all the molding line,
curve and corners accurate.
Mold
Making Dimension
Controlling
The
precision mold making machine, and correct machining process can not guarantee
100% dimension correct. We need strong controlling to any tooling result to be
sure that all the machining results are within tolerance.
Mold
Making Mass
Production Simulation
When the
molds components are assembled, it is not meaning that we have finished the
mold making, we need to run the mold on the molding machine to be sure that the
molds are suitable for high speed injection molding and stable dimension molded
plastic parts. After long time running, if there is none damage, then we can
say we have finished this mold
making.
Here is
one of our branch from Sino holdings group
SINOPK
manufactured the 24 cavities tooth
paste cap mold mass production
simulation, totally around 100 hours continues high speed running, the result
is that this tooth paste cap mold is very successful made. After 3 sets of
similar tooth paste cap mould manufacturing and design improvements, SINOPK
become the only expert for tooth paste cap mold manufacturing in China.
Tooth paste top flip cap
mold cavities steel: DIN 1. 2316
Toothpaste top flip cap mold core steel: DIN 1. 2083
Toothpaste top flip cap mold runner system: Semi Hot Runner (
hot bush plus tunnel gate)
Toothpaste top flip cap mold ejection system: unscrewing ejection system
Tooth paste top flip cap mold ejection action: when mold opend, the flip top cap closed by slider in the mould mechanical
system, then unscrewing by
hydraulic cylinder, finally ejection.
Toothpaste top flip cap mold cycle time: 15 seconds
Toothpaste top flip cap mold delivery time: 80 days
if posted by Dinaa
email:export16@sinomould.com
Skype:sinogroupe-1
.